High/low current separation bracket

  • Physical separation – Defines the routing areas for power and data cables within the SH1 trunking.
  • Snap-in installation – No screws or adhesive required for the flange itself.
  • Length: 150 cm – To be cut to the required length of the run if necessary.

28,32 €

Pay in 3 installments with no fees using Klarna on purchases of 35 € or more

In stock - Ready to be shipped

28,32 €

SH1 profileSnap-in installationLength 150 cm
Power / low-voltage separation barrier

150 cm — Exclusively compatible with SH1 profile

Organize the routing of your cables in the EUBIQ SH1 cable duct with this 150 cm separation barrier. It creates a physical separation between the cable routing areas for power cables and data cables.

Two wiring areas in the SH1 profile

Physical separation

The barrier helps define the cable routing areas inside the SH1 duct.

Organized routing

Power cables and signal cables have separate routes, for a clearer installation.

Accessory designed for the SH1

Its shape is adapted to this EUBIQ profile. Check the reference of your duct before ordering.

EUBIQ barrier specifications

150 cm
Length supplied

Adjust to the useful length of the route if necessary.

150 g
Indicated weight
SH1
Compatible profile

Designed specifically for the EUBIQ SH1 duct.

Installation in 5 steps

1

Prepare your duct

Check the mounting of the SH1 profile and prepare the installation area according to the system documentation. Any work on the electrical installation must be carried out when de-energized by a person qualified in electricity.

2

Adjust the length if necessary

For a section shorter than 150 cm, measure the useful length then adjust the barrier with a suitable tool. Hold the piece, follow the tool's safety instructions and deburr the cut.

3

Insert the barrier

Position it in the designated location of the SH1 profile, in accordance with the system documentation, to define two routing areas.

4

Distribute the cables

Organize the power cables and signal cables on either side of the separation, according to the requirements applicable to the installation.

5

Check then close

Check the positioning of the barrier and the cables before closing the profile with the appropriate elements.

For which projects?

Professional premises

Organization of cabling in the SH1 routes of offices, workstations and professional premises.

Residential developments

Organized routing of power and data cables in home SH1 installations.

Technical specifications

Characteristic Value
Brand EUBIQ
Length 150 cm
Dimensions (L × W × H) 150 × 2 × 1 cm
Indicated weight 150 g
Compatibility Exclusively SH1 profile
Use Power / low-voltage separation
Installation Snap-in into the profile

Frequently asked questions

What length is supplied?

The barrier measures 150 cm. Its dimensions are 150 × 2 × 1 cm.

Can the length be adjusted?

Yes. For a section shorter than 150 cm, measure the required length then make a clean cut with a suitable tool, following its safety instructions. Deburr before installation.

Is it compatible with other profiles?

This barrier is designed exclusively for the EUBIQ SH1 profile. For another model, check the reference of the corresponding separator.

How is the barrier installed?

By snapping it into the designated location of the SH1 profile, without screws or glue for the barrier itself. An eventual cut requires a suitable tool.

Is the barrier sufficient to validate the installation?

No. This accessory defines the routing areas in the duct. The entire cabling and its implementation must still be checked by a person qualified in electricity.

Important note: the barrier is a physical separation accessory. It does not constitute a certification of conformity of the installation, nor a guarantee of absence of interference or compartment sealing.

An organized SH1 route, with distinct wiring areas.

EUBIQ separation barrier · Length 150 cm · SH1 profile

Characteristic Value
FinishingBrushed aluminum
Attachment typeSurface-mounted
BrandEUBIQ
Reference5011-0300-0533

FAQ6 Questions

FAQ – EUBIQ high/low voltage separation bracket for SH1 profile

What length is supplied?

The bracket measures 150 cm. Its dimensions are 150 × 2 × 1 cm.

What is its function?

It creates a physical separation between the power cable and data cable routing areas in the SH1 trunking.

Is it compatible with all EUBIQ profiles?

No. It is designed exclusively for the SH1 profile. For another model, check the reference of the suitable separator.

Can it be cut to a length shorter than 150 cm?

Yes. Measure the required length, hold the piece in place and use a suitable tool while following its safety instructions. Make a clean cut and deburr before installation.

How is the bracket installed?

It is inserted into the designated slot in the SH1 profile, without screws or glue for the bracket itself. Any necessary cutting requires a suitable tool. Follow the system's installation documentation.

Is the bracket sufficient to validate the installation?

No. It is a physical separation accessory, not a certification of the overall assembly's compliance. The wiring and its implementation must be checked by a qualified electrical professional. Any work on the electrical installation must be carried out when the power is off.

Expert Advice

Mon–Fri 9am–6pm

Fast delivery

Home or pick-up point

GSS Patent

Maximum Security

WHAT OUR CLIENTS SAY ABOUT US

Discover below the reviews left by our hundreds of satisfied customers. These reviews come from verified buyers, and are controlled and verified by Judge.me, acting as a trusted third party between Eubiqeurope and its customers.

4.8 out of 5 stars based on 443 reviews.

Are you a professional ?

Electrician, fitter, furniture maker, kitchen designer...Apply for your professional account now to benefit from your conditions.